Development of 5 MW PEM electrolyser facility to be installed on land adjacent to a substation, near an industrial cluster. The renewable H2 produced will be supplied to mobility offtakers through a Hydrogen Refuelling Station (HRS) and a tube trailer loading bay. The project has a €2m subsidy awarded for the HRS.
Evolution of the Project AllHydro
18M€
0%
Investment in developing infrastructure
5MW
0%
Electrolysis capacity
450
tonnes/year
0%
tonnes/year
Renewable H2 output generated
8,235
tonnes/year
0%
tonnes/year
Reduction in CO2 emissions
18M€
0%
Investment in developing infrastructure
5MW
0%
Electrolysis capacity
450
tonnes/year
0%
tonnes/year
Renewable H2 output generated
8,235
tonnes/year
0%
tonnes/year
Reduction in CO2 emissions
BENORTH2
Development of 5MW in Phase I and 15MW in Phase II electrolysis capacity in the facilities of the combined cycle power plat in Amorebieta. The renewable hydrogen produced will be consumed by the CCGT, industrial and mobility operators throughout the regional valley. Benorth2 will be realized in parallel with the planned dedicated hydrogen distribution pipeline of Nortegas, official partner in the project.The unique proposition of BenortH2 has been recognized by the Hydrogen Valley platform, a joint initiative by Clean Hydrogen Platform and Mission Innovation. A valuable token of appreciation that has been awarded to a limited number of projects globally.
Laying the Groundwork for Large-Scale Deployment
At HyFive, we are also actively developing strategically located small-scale projects. These initiatives are positioned in key areas to facilitate offtake by critical early adopters — particularly logistics and transport operators. Each project is carefully selected to overcome the typical challenges of scale, while providing valuable execution and operational experience. This pioneering groundwork will serve as a foundation for the successful delivery of our larger-scale developments.